Blar i SINTEF Community på tittel
Viser treff 2188-2207 av 2237
-
Wood coating failures against natural and accelerated climates
(Journal article; Peer reviewed, 2015)Monitoring, assessment and prediction of service life of materials are a serious challenge for the building and construction sector. According to ISO 15686 (2008), laboratory testing must be performed alongside field testing ... -
Wood Facade Materials Ageing Analysis by FTIR Spectroscopy
(Journal article; Peer reviewed, 2015)Attenuated total reflection Fourier transform infrared spectroscopy is used in this study to quantify wood degradation. Nine different types of wood materials were studied. All types of wood were exposed in an Atlas solar ... -
Workshop on Manufactured Sand, Stavanger, Norway 20–21 October 2014 : FA: Competitive constructions : SP 2.3 Production of high quality manufactured aggregate for concrete
(COIN Project report;80, Research report, 2015) -
Workshop on Manufactured Sand, Stavanger, Norway 30~31 October 2008 : FA: Competitive constructions : SP 2.3 Production of high quality manufactured aggregate for concrete
(COIN Project report;79, Research report, 2015) -
Workshop on Moisture in Concrete, Trondheim, Norway 6–7 February 2012. Measurement of moisture and relative humidity in concrete. FA 3 Technical performance. FA 3.2 Service life
(COIN Projet report;81, Research report, 2016) -
WP1: Construction logistics scenarios and stakeholder involvement Deliverable 1.1: Scenarios of construction logistics
(Research report, 2020)Construction logistics scenarios is an illusive term, that need to be defined to be useful. This deliverable defines construction logistics scenarios as part of both the construction process planning and the construction ... -
WP4: Smart Governance. Deliverable 4.1: Evaluation of Smart Governance 1.0
(Research report, 2021) -
WP4: Smart Governance. Deliverable 4.2: Smart Governance 2.0
(Research report, 2021) -
WP4: Smart Governance. Deliverable 4.3: Policy instrument
(Research report, 2021)Preface. This report is a deliverable (D4.3) in the MIMIC project, under WP4, Task 4.3. The aim of WP4 is: • test the Smart Governance Concept 1.0 developed under the previous CIVIC project with an attempt to include ... -
YDALIR. Testing av alle ZEN nøkkelindikatorer i en ZEN-pilot
(ZEN Report;51, Research report, 2023)Testing av alle ZEN nøkkelindikatorer på Ydalir. Denne rapporten tester ut alle ZEN nøkkelindikatorene i ZEN-pilotområdet Ydalir. Resultatene skal brukes i videreutvikling og verifisering av ZEN-definisjonen og vil gi ... -
Yttervegg av bindingsverk med mineralullisolasjon
(Særtrykk (Norges byggforskningsinstitutt);222, Others, 1974) -
Yttervegg med rammeverk av tynne stålprofiler
(Særtrykk (Norges byggforskningsinstitutt);223, Others, 1974) -
ZEB Laboratory - Research Possibilities
(SINTEF Notat;33, Research report, 2019)The ZEB Laboratory is an experimental facility located in NTNU Gløshaugen campus in Trondheim. The building is designed as 4 storeys high and 1800 m2 area office space and should achieve the ZEB-COM ambition level over 60 ... -
The ZEB Laboratory: the development of a research tool for future climate adapted zero emission buildings
(Peer reviewed; Journal article, 2021)The building sector is responsible for approximately 40 % of the energy consumption and carbon emissions worldwide. Buildings of the future will have to comply not only with stricter energy regulations, but they will also ... -
ZEB Pilot Campus Evenstad. Administration and educational building. As-built report
(ZEB Project report;36, Research report, 2017)This report describes the new ZEB Campus Evenstad pilot administration and educational building. The report summarizes and documents the as-built phase life cycle greenhouse gas (GHG) emissions of the administration and ... -
ZEB pilot Heimdal high school and sports hall. Design phase report
(ZEB Project report;34, Research report, 2017)This report summarizes and documents the pre-project competition and design phase life cycle greenhouse gas (GHG) emissions of Heimdal pilot building project. The report describes the calculation methodologies; including ... -
ZEB Pilot house Larvik (Multicomfort) AS-built
(Conference object, 2016) -
ZEB pilot house Larvik. As Built Report
(ZEB Project report;33, Research report, 2017)This report describes the ZEB pilot house Larvik, which was constructed during the autumn 2014. The ZEB pilot house is a two-storey single-family residential building situated near Larvik, Norway. The building was designed ... -
ZEBRA 2020 - NEARLY ZERO-ENERGY BUILDING STRATEGY 2020. Strategies for a nearly Zero-Energy Building market transition in the European Union
(Research report, 2016)European legislation makes nearly Zero-Energy Buildings (nZEBs) a standard by 2020. The technology is available and proven; however, the large-scale uptake of nZEB construction and renovation remains a challenge. ZEBRA2020 ...