Show simple item record

dc.contributor.authorHelseth, Arild
dc.contributor.authorRex, Stefan
dc.contributor.authorMo, Birger
dc.date.accessioned2023-08-21T12:00:03Z
dc.date.available2023-08-21T12:00:03Z
dc.date.created2023-07-06T13:31:55Z
dc.date.issued2023
dc.identifier.citation2023 19th International Conference on the European Energy Market - EEMen_US
dc.identifier.isbn979-8-3503-1258-4
dc.identifier.issn2165-4077
dc.identifier.urihttps://hdl.handle.net/11250/3085061
dc.description.abstractThis work concerns the modeling of ramping constraints on discharge in medium-term hydropower scheduling models applied in a liberalized market context. Such models often apply a coarse time discretization to ensure reasonable computation times. Consequently, ramping constraints at a fine time-resolution are challenging to represent. To address this challenge, we derive a quadratic transition-cost term capturing the power production shifted to time periods with less favorable prices due to ramping constraints. We approximate the quadratic term by linearization so that it can be embedded in an existing hydropower scheduling tool based on stochastic linear programming. A prototype hydropower scheduling model, including the approximated transition-cost term, was tested on a realistic hydropower system in Norway. We demonstrate that the improved modeling of ramping constraints significantly impacts discharge patterns and comes at a significant, but not prohibitive, increase in computation time.en_US
dc.description.abstractApproximating Ramping Constraints in Hydropower Schedulingen_US
dc.language.isoengen_US
dc.publisherIEEEen_US
dc.relation.ispartof2023 19th International Conference on the European Energy Market - EEM
dc.relation.ispartofseriesInternational Conference on the European Energy Market;19
dc.rightsNavngivelse 4.0 Internasjonal*
dc.rights.urihttp://creativecommons.org/licenses/by/4.0/deed.no*
dc.titleApproximating Ramping Constraints in Hydropower Schedulingen_US
dc.title.alternativeApproximating Ramping Constraints in Hydropower Schedulingen_US
dc.typeChapteren_US
dc.typePeer revieweden_US
dc.description.versionacceptedVersionen_US
dc.rights.holderThe Authors hold the copyright to the Author Accepted Manuscript. Distributed under the terms of the Creative Commons Attribution License (CC BY 4.0)en_US
dc.identifier.doihttp://dx.doi.org/10.1109/EEM58374.2023.10161811
dc.identifier.cristin2161242
dc.relation.projectNorges forskningsråd: 257588en_US
cristin.ispublishedtrue
cristin.fulltextpostprint
cristin.qualitycode1


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record

Navngivelse 4.0 Internasjonal
Except where otherwise noted, this item's license is described as Navngivelse 4.0 Internasjonal