dc.description.abstractJust south of Oslo Central Station, the new high-speed Follo Line railway tunnels pass beneath the existing Ekeberg road tunnels. This paper presents the construction methods, numerical model, and monitoring program used to assess the stability of the E6 road tunnels during the excavation of the Follo Line tunnels only a few metres below. The construction of the Follo Line was approved subject to three conditions: (1) there should be no negative effect on the stability of the Ekeberg tunnels, (2) the traffic flow in the Ekeberg tunnels had to be maintained at all times and (3) any risk of instability in the existing tunnels must be detected beforehand, so that necessary precautionary actions could be taken in good time. To deal with the challenges, SINTEF developed a comprehensive analysis procedure, combining continuous rock stress measurements and displacement measurements with 2D and 3D numerical modelling. The rock stress change monitoring was used together with the numerical model to monitor the stability conditions in the Ekeberg tunnels as the Follo Line tunnels were excavated. This ensured that any risk of instability in the existing tunnels could be detected in advance to enable precautionary action to be taken. The successful completion of the new tunnels without any disturbance to the road tunnels shows that the procedure would be useful for dealing with similar applications in the future.en_US
dc.language.isoengen_US
dc.publisherSpringerLinken_US
dc.rightsCC BY 4.0*
dc.rights.urihttp://creativecommons.org/licenses/by/4.0/.*
dc.subjectRailway tunnelen_US
dc.subjectNumerical modelen_US
dc.subjectTunnel constructionen_US
dc.subjectMonitoringen_US
dc.titleChallenging Infrastructure Project Assisted by Monitoring and Numerical Modelling as the Follo Line Tunnels were Excavated Below Existing Tunnelsen_US
dc.typePeer revieweden_US
dc.typeJournal articleen_US
dc.description.versionpublishedVersionen_US
dc.rights.holder© The authorsen_US
dc.subject.nsiVDP::Teknologi: 500en_US
dc.source.volume351en_US
dc.source.journalRock Mechanics and Rock Engineeringen_US
dc.identifier.doi10.1007/s00603-021-02371-9
dc.identifier.cristin1895572
cristin.ispublishedtrue
cristin.fulltextoriginal
cristin.qualitycode2


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

Vis enkel innførsel

CC BY 4.0
Med mindre annet er angitt, så er denne innførselen lisensiert som CC BY 4.0