Blar i Rapporter fra SINTEF Community på emneord "Case study"
Viser treff 1-5 av 5
-
A preliminary study on using manufactured sand from Jelsa Quarry for the production of plastic concrete mixes. FA 2 Competitive constructions. SP 2.3 High quality manufactured sand for concrete
(COIN Project report;42, Research report, 2012) -
EE Settlement – Norwegian case studies
(SINTEF Notat;39, Research report, 2021)The vision of the project EE settlement – Embodied energy, costs and traffic in different settlement patterns is to provide a decision support tool and a guideline which enable municipal planners and other stakeholders to ... -
The Visund office building, Haakonsvern, Bergen. As-built report
(ZEB Project report;36, Research report, 2017)The Visund office building is a pilot project within the Research Centre on Zero Emission Buildings (ZEB) in Norway. The building has 2031 m2 of heated floor area and is located at Haakonsvern, about 15 km from the centre ... -
ZEB Pilot Campus Evenstad. Administration and educational building. As-built report
(ZEB Project report;36, Research report, 2017)This report describes the new ZEB Campus Evenstad pilot administration and educational building. The report summarizes and documents the as-built phase life cycle greenhouse gas (GHG) emissions of the administration and ... -
ZEB pilot house Larvik. As Built Report
(ZEB Project report;33, Research report, 2017)This report describes the ZEB pilot house Larvik, which was constructed during the autumn 2014. The ZEB pilot house is a two-storey single-family residential building situated near Larvik, Norway. The building was designed ...