dc.contributor.authorMorch, Andrei Z
dc.contributor.authorMigliavacca, Gianluigi
dc.contributor.authorEgorov, Alexandr
dc.contributor.authorErgun, Hakan
dc.contributor.authorSiface, Dario
dc.contributor.authorLattanzio, Giorgia
dc.contributor.authorSperstad, Iver Bakken
dc.date.accessioned2024-07-30T12:27:37Z
dc.date.available2024-07-30T12:27:37Z
dc.date.created2023-09-19T14:47:37Z
dc.date.issued2024
dc.identifier.issn2732-5121
dc.identifier.urihttps://hdl.handle.net/11250/3143734
dc.description.abstractThe FlexPlan Horizon2020 project aimed at establishing a new grid planning methodology which considers the opportunity to introduce new storage and flexibility resources in electricity transmission and distribution grids as an alternative to building new grid elements, in accordance with the intentions of the European Commission regulatory package "Clean Energy for all Europeans". FlexPlan creates a new innovative grid planning tool which is intended to go beyond the state of the art of planning methodologies by including the following innovative features: assessment of best planning strategy by analysing in one shot a high number of candidate expansion options provided by a pre-processor tool, simultaneous mid- and long-term planning assessment over three grid years (2030-2040-2050), incorporation of full range of cost benefit analysis criteria into the target function, integrated transmission distribution planning, embedded environmental analysis (air quality, carbon footprint, landscape constraints), probabilistic contingency methodologies in replacement of the traditional N-1 criterion, application of numerical decomposition techniques to reduce calculation efforts and analysis of variability of yearly RES and load time series through a Monte Carlo process. Six regional cases covering nearly the whole European continent are developed in order to cast a view on grid planning in Europe till 2050. The final step in FlexPlan was formulating guidelines for regulators and planning offices of system operators, by indicating to what extent system flexibility can contribute to reduce overall system costs (operational and investment) yet maintaining current system security levels and which regulatory provisions could foster such process. This paper focuses on the regulatory issues, which were uncovered during the initiation phase and of the project and refined in throughout six regional cases. In order to substantiate this, the paper explains in brief the developed and applied FlexPlan methodology and its testing in six regional cases.en_US
dc.description.abstractRegulatory Implications for considering flexible resources in network expansion planning: main lessons from regional cases in the H2020 FlexPlan projecten_US
dc.language.isoengen_US
dc.publisherEUen_US
dc.rightsNavngivelse 4.0 Internasjonal*
dc.rights.urihttp://creativecommons.org/licenses/by/4.0/deed.no*
dc.titleRegulatory Implications for considering flexible resources in network expansion planning: main lessons from regional cases in the H2020 FlexPlan projecten_US
dc.title.alternativeRegulatory Implications for considering flexible resources in network expansion planning: main lessons from regional cases in the H2020 FlexPlan projecten_US
dc.typePeer revieweden_US
dc.typeJournal articleen_US
dc.description.versionpublishedVersionen_US
dc.rights.holderThe Authorsen_US
dc.source.volume3en_US
dc.source.journalOpen Research Europeen_US
dc.identifier.doi10.12688/openreseurope.15873.2
dc.identifier.cristin2176570
dc.relation.projectEC/H2020/863819en_US
dc.relation.projectNorges forskningsråd: 257626en_US
dc.source.articlenumber149en_US
cristin.ispublishedtrue
cristin.fulltextoriginal
cristin.qualitycode1


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

Vis enkel innførsel

Navngivelse 4.0 Internasjonal
Med mindre annet er angitt, så er denne innførselen lisensiert som Navngivelse 4.0 Internasjonal