Vis enkel innførsel

dc.contributor.authorVrana, Til Kristian
dc.contributor.authorHärtel, Philipp
dc.date.accessioned2019-05-21T07:34:54Z
dc.date.available2019-05-21T07:34:54Z
dc.date.created2018-03-08T14:08:36Z
dc.date.issued2018
dc.identifier.citationElectric power systems research. 2018, 160 99-108.nb_NO
dc.identifier.issn0378-7796
dc.identifier.urihttp://hdl.handle.net/11250/2598153
dc.description.abstractInvestment model cost parameters for VSC HVDC transmission infrastructure continue to be associated with high uncertainty and their validity remains a crucial challenge. Thus, it is the key objective of this analysis to identify a new cost parameter set providing better investment cost estimates than currently available cost parameter sets. This parameter estimation is based on a previously conducted review of investment model cost parameters including its collection of existing cost parameter sets and project cost reference data. By using a particle swarm optimisation, the overall error function of the review's evaluation methodology is minimised to obtain an optimal parameter set. The results show, however, that the optimised parameter sets are far from being realistic and useful, which is why an improved overall error function is developed. Effectively penalising negative and near-zero cost parameter coefficients, this new overall error function delivers a realistic and well-performing cost parameter set when being minimised. In fact, the new parameter set produces better cost estimates for back-to-back, interconnector, and offshore wind connection projects than any of the existing cost parameter sets. Therefore, it is a valuable contribution and shall be considered in future grid investment analyses involving VSC HVDC technology.nb_NO
dc.description.abstractEstimation of investment model cost parameters for VSC HVDC transmission infrastructurenb_NO
dc.language.isoengnb_NO
dc.publisherElseviernb_NO
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internasjonal*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/deed.no*
dc.titleEstimation of investment model cost parameters for VSC HVDC transmission infrastructurenb_NO
dc.title.alternativeEstimation of investment model cost parameters for VSC HVDC transmission infrastructurenb_NO
dc.typeJournal articlenb_NO
dc.typePeer reviewednb_NO
dc.description.versionacceptedVersionnb_NO
dc.source.pagenumber99-108nb_NO
dc.source.volume160nb_NO
dc.source.journalElectric power systems researchnb_NO
dc.identifier.doi10.1016/j.epsr.2018.02.007
dc.identifier.cristin1571484
dc.relation.projectNorges forskningsråd: 193823nb_NO
dc.relation.projectNorges forskningsråd: 228981nb_NO
dc.relation.projectEC/FP7/609795nb_NO
cristin.unitcode7548,50,0,0
cristin.unitnameEnergisystemer
cristin.ispublishedtrue
cristin.fulltextpostprint
cristin.qualitycode1
dc.date.embargoenddate2020-02-23


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

Vis enkel innførsel

Attribution-NonCommercial-NoDerivatives 4.0 Internasjonal
Med mindre annet er angitt, så er denne innførselen lisensiert som Attribution-NonCommercial-NoDerivatives 4.0 Internasjonal