User evaluation of vacuum insulation in clay blocks
(ZEB Project report;12, Research report, 2013)This is an early user test of vacuum insulation embedded in clay blocks, a solution developed within ZEB. The product is in an early stage of its development and is not taken into use in any building projects yet. Therefore, ... -
User evaluations of energy efficient buildings. The interplay of buildings and users in seven European case studies
(ZEB Project report;1, Research report, 2011) -
Window with integrated solar collector : Climate resistance evaluation report
(ZEB Project report;26, Research report, 2015)The NorDan solar collector is a window/solar collector combination which can be mounted as a traditional window in the façade of a new building. The component is originally designed for new buildings, but the research and ... -
ZEB Pilot Campus Evenstad. Administration and educational building. As-built report
(ZEB Project report;36, Research report, 2017)This report describes the new ZEB Campus Evenstad pilot administration and educational building. The report summarizes and documents the as-built phase life cycle greenhouse gas (GHG) emissions of the administration and ... -
ZEB pilot Heimdal high school and sports hall. Design phase report
(ZEB Project report;34, Research report, 2017)This report summarizes and documents the pre-project competition and design phase life cycle greenhouse gas (GHG) emissions of Heimdal pilot building project. The report describes the calculation methodologies; including ... -
ZEB pilot house Larvik. As Built Report
(ZEB Project report;33, Research report, 2017)This report describes the ZEB pilot house Larvik, which was constructed during the autumn 2014. The ZEB pilot house is a two-storey single-family residential building situated near Larvik, Norway. The building was designed ... -
Zero Village Bergen. Aggregated loads and PV generation profiles
(ZEB Project report;28, Research report, 2016)The main findings can be summarized as follows: •The aggregated annual thermal load is approximately the same as the electric load (3.3 GWh) for the entire Zero Village Bergen; •The aggregated annual PV generation (2.9 ... -
Zero Village Bergen. Energy system analysis
(ZEB Project report;40, Research report, 2018)Based on discussions with the project partners, three possible solutions have been investigated for the energy system of Zero Village Bergen: 1. District Heating (DH) 2. Biomass fired Combined Heat and Power (Bio ...