Vis enkel innførsel

dc.contributor.authorNazir, Shareq Mohd
dc.contributor.authorBolland, Olav
dc.contributor.authorAmini, Shahriar
dc.date.accessioned2020-12-22T11:41:48Z
dc.date.available2020-12-22T11:41:48Z
dc.date.created2017-09-25T14:05:40Z
dc.date.issued2017
dc.identifier.citationEnergy Procedia. 2017, 114 2146-2155.en_US
dc.identifier.issn1876-6102
dc.identifier.urihttps://hdl.handle.net/11250/2720760
dc.description.abstractIn this study, first of its kind complete plant scale integration of pre-combustion CO2 capture method with Chemical Looping Reforming (CLR) of Natural Gas (NG), Water Gas Shift (WGS) process, CO2 capture and CO2 compression in a combined cycle power plant has been presented. The CLR consisted of oxidation and fuel reactor. The oxidation reactor oxidizes the metal oxygen carrier with compressed air and produces an oxygen depleted air stream (N2 stream) as by-product. The fuel reactor reforms the NG with the metal oxide in presence of steam to produce syngas. The syngas is further subjected to WGS and CO2 capture using a-MDEA, to prepare a H2-rich fuel, which is combusted in the Gas Turbine (GT) system. The heat from cooling of process streams in the pre-combustion CO2 capture method, is used to prepare saturated low pressure steam, fraction of which is used in reboiler to regenerate the amine for CO2 capture, and the remainder is expanded in Steam Turbine (ST) to generate power. The power plant is a combined cycle with two GT, two Heat Recovery Steam Generators (HRSG) and one ST. 12% of air entering the GT is used in the oxidation reactor of CLR, and equivalent amount of N2 stream is compressed and added as diluent in the GT. The overall process was integrated and analysed at full load conditions. The current process has also been compared with Natural Gas Combined Cycle (NGCC) plant without CO2 capture. The net electric efficiency of the power plant with pre-combustion CO2 capture in this study is 43.1%, which is 15.3%-points less than the NGCC plant without capture. Major energy penalty in the process comes from air compressor, the diluent N2 stream compressor and due to low degree of process integration to avoid complexity.en_US
dc.language.isoengen_US
dc.publisherElsevieren_US
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internasjonal*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/deed.no*
dc.subjectprocess integrationen_US
dc.subjectfull plant scale analysisen_US
dc.subjectcombined cycle power plantsen_US
dc.subjectchemical looping reformingen_US
dc.subjectCO2 captureen_US
dc.subjectpre-combustionen_US
dc.titleFull Plant Scale Analysis of Natural Gas Fired Power Plants with Pre-Combustion CO2 Capture and Chemical Looping Reforming (CLR)en_US
dc.typePeer revieweden_US
dc.typeJournal articleen_US
dc.description.versionpublishedVersionen_US
dc.rights.holder© 2017 The Author(s). Published by Elsevier Ltd. This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).en_US
dc.source.pagenumber2146-2155en_US
dc.source.volume114en_US
dc.source.journalEnergy Procediaen_US
dc.identifier.doi10.1016/j.egypro.2017.03.1350
dc.identifier.cristin1497774
cristin.unitcode7401,80,5,2
cristin.unitnameStrømningsteknikk
cristin.ispublishedtrue
cristin.fulltextoriginal
cristin.qualitycode1


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

Vis enkel innførsel

Attribution-NonCommercial-NoDerivatives 4.0 Internasjonal
Med mindre annet er angitt, så er denne innførselen lisensiert som Attribution-NonCommercial-NoDerivatives 4.0 Internasjonal