Vis enkel innførsel

dc.contributor.authorBjørndal, Endre
dc.contributor.authorBjørndal, Mette
dc.contributor.authorMidthun, Kjetil Trovik
dc.contributor.authorTomasgard, Asgeir
dc.date.accessioned2020-11-30T15:06:18Z
dc.date.available2020-11-30T15:06:18Z
dc.date.created2018-04-06T14:42:35Z
dc.date.issued2018
dc.identifier.citationEnergy. 2018, 150 992-1005.en_US
dc.identifier.issn0360-5442
dc.identifier.urihttps://hdl.handle.net/11250/2690339
dc.description.abstractWe consider an energy-only electricity market where some generation and/or load is uncertain, and where there are flexibility costs, i.e. some conventional power plants have to be scheduled well before real time in order to participate in the dispatch, while for others, additional cost incurs if generation plans have to be adjusted close to real time. In practice, electricity markets are often organized with sequential market clearing, and in this paper, we consider two sequential markets, for instance representing a day-ahead and a real-time market. We compare the outcomes of 1) a stochastic market clearing model, i.e. an integrated model that takes into account both markets and the uncertainty, to 2) a myopic market clearing model, where the first market is cleared based only on given bids, and not taking into account neither the uncertainty nor the bids to the second market. Compared to previous literature, our main contribution is that we compare the two different market models with respect to both efficiency and allocation of surplus, and thus the incentives they imply for the market participants. We discuss what information is needed in market agent bids and how that information can be manipulated. While the stochastic market clearing gives a solution with a higher expected social welfare, it poses several challenges for market design. The stochastic dispatch may lead to a dispatch where the day-ahead prices deviate from the bid curves to the first market. This can lead to incentives for self-scheduling, in that it may require market participants to accept prices that deviate from the marginal costs or benefits corresponding to the scheduled quantities. Our analysis shows that the intermittent producer has an incentive to deviate from the system optimal plan in both the myopic and stochastic model, and this incentive is particularly strong under the myopic model. We also discuss how the expected social welfare of the market outcome under stochastic market clearing depends on the quality of the information that the system operator will base the market clearing on. In particular, we show that an intermittent producer may have an incentive to misreport the probability distribution for its generation.en_US
dc.language.isoengen_US
dc.publisherElsevieren_US
dc.relation.urihttp://hdl.handle.net/11250/2401590
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internasjonal*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/deed.no*
dc.subjectStochastic programmingen_US
dc.subjectElectricityen_US
dc.subjectMarket designen_US
dc.titleStochastic electricity dispatch: A challenge for market designen_US
dc.typePeer revieweden_US
dc.typeJournal articleen_US
dc.description.versionacceptedVersionen_US
dc.rights.holder© 2018. This is the authors’ accepted and refereed manuscript to the article. This manuscript version is made available under the CC-BY-NC-ND 4.0 license http://creativecommons.org/licenses/by-nc-nd/4.0/en_US
dc.source.pagenumber992-1005en_US
dc.source.volume150en_US
dc.source.journalEnergyen_US
dc.identifier.doi10.1016/j.energy.2018.02.055
dc.identifier.cristin1577983
dc.relation.projectNorges forskningsråd: 209697en_US
cristin.unitcode7401,80,62,0
cristin.unitnameBærekraftig energiteknologi
cristin.ispublishedtrue
cristin.fulltextpostprint
cristin.qualitycode2


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

Vis enkel innførsel

Attribution-NonCommercial-NoDerivatives 4.0 Internasjonal
Med mindre annet er angitt, så er denne innførselen lisensiert som Attribution-NonCommercial-NoDerivatives 4.0 Internasjonal